Long Reach Arm and Boom

Short Description:

The telescopic arm is also called a barrel arm could be Sup-plied by TYSIM. With Over Ten Years Welding Experience Welders and Machining Workers Striving for Perfection on Every Details, TYSIM Keep Providing a Large Quantities of Strong Long Reach Boom & Arm with Best Cost Performance Globally


Product Detail

Product Tags

Product description

The telescopic arm is also called a barrel arm could be Sup-plied by TYSIM. With Over Ten Years Welding Experience Welders and Machining Workers Striving for Perfection on Every Details, TYSIM Keep Providing a Large Quantities of Strong Long Reach Boom & Arm with Best Cost Performance Globally

38

Long Reach Arm and Boom

The material of long rench is Q345B, two type of long reach is standard and enhanced. Standard long reach are a applied to light road working as environment channel dredging. Slope finishing, deep cue mining, etc; enhanced long reachs are applied to hard soil and grave loading working environment,

Models 12T 20T 22T 30T 35T 40T 45T
Total length (mm) 13000 15380 15380 18000 20000 22000 24000
Weight(kg) 3000 4000 4200 5200 6000 6500 7000
Bucker capacity(m³) 0.3 0.4 0.4 0.4 0.5 0.6 0.6
Max digging reach(mm) 11300 12500 12600 13700 15000 16000 17200
Max digging depth(mm) 12500 15000 15000 17500 19500 21500 23500
Transport height(mm) 9000 11300 11300 13000 15000 16500 18000
Additional counter weight(kg) 2900 3000 3050 3200 3250 3350 3400

 

High Reach Demolition

The material of high reach demolition is Q345B, high reach demolition is applied to demolish high-rise building.

Models 22T 30T 35T 40T 45T
Total length (mm) 16000 18000 20000 22000 24000
Weight(kg) 5000 6000 7000 8000 9000
Limitation for weight of shear(kg) Under 2000 Under 2000 Under 2000 Under 2000 Under 2000
Transport height(mm) 3200 3300 3350 3400 3450

Construction photos

39

Product advantage

The company can design and produce high reach demolition for excavators of various brands according to customer’s requirement. With advanced computer-assisted design system. More than ten years’ design and manufacturing experience of long reachs, The application of finite element method to analysis long reachs stress distribution, We make better design to high reach demolition’s structure. Our high demolition is stable and reliable.

40

Packing & Shipping

2020042111370712

FAQ

1.What logistics way for product delivery?

1.90% in shipment by sea, to all main continents such as South America, Middle East, African and Oceania, etc.

2. For neighborhood countries of China, including Russia, Mongolia, Uzbekistan etc. we can ship by road or railway.

 3. For light parts in urgent need, we can deliver in international courier service, including DHL, TNT or FedEx.

2.What is your lead time?

We aim to provide customers with a realistic lead time. We understand emergencies happen and priority production should be preferred in a faster turnaround. A stock order lead time is 3-5 working days, while custom orders within 1-2 weeks. Contact with TYSIM products so we can provide an accurate lead time basing on situations.


  • Previous:
  • Next:

  • Write your message here and send it to us