Recently, Wuxi has embarked on a comprehensive effort to restore the ecological environment of rivers and lakes, shape the shoreline landscape, preserve historical heritage, and build public service facilities. The focus is on addressing prominent issues along the river and lake shorelines, creating a 'Beautiful Rivers and Lakes' scenic route that embodies ecological beauty, cultural heritage, nostalgia, benefits for citizens, and harmonious coexistence of people and water.
One TYSIM KR125A rotary drilling rig participated in the construction of the 'Jiangxi Street Beautiful Rivers and Lakes Comprehensive Enhancement Project - Jiejing Bang' section and achieved an engineering construction volume of 357 meters in an 8-hour shift. It also provided comprehensive services, including drilling, steel cage fabrication, and slurry pouring in a tight space. This not only brought significant economic benefits to the customer but also earned high recognition from them."
This project is a key initiative of Wuxi City's Beautiful Rivers and Lakes Action. It involves comprehensive improvements to the landscape and water environment of 10 rivers within Jiangxi Street, including Jiejing Bang, Hongqiao Bang, Qianjin River, Meidong River, and others. The main construction components include the construction of new pathways and railings, optimization and enhancement of greenery, embankment restoration, and enhancement of landscape features, improved lighting, and upgrades to water supply and drainage systems. The total length of the river channels is approximately 8.14 kilometers, with the goal of transforming them into an industrial, scenic, and cultural corridor with unique characteristics and top-notch quality. This project aims to create a riverside green space landscape that is 'waterfront, clean, open, and pleasant'.
It is known that the geological conditions are mainly backfill and silty clay layers, with a pile diameter of 0.6 m and a depth of 7 m. It mainly protects important buildings along the river and the safety of thermal pipelines on the bank. The professional construction team of Tyhen Foundation, a subsidiary of Tysim, inspected and confirmed the construction scheme on site: it is necessary to adopt non-excavation slope protection technology under the premise of ensuring the safety of buildings. Drilling first and placing reinforcement cage, and finally pouring concrete, to ensure the safety of the river while ensuring the safety of the building, and avoid mud pollution of the environment at the same time. The foundation construction team of Tyhen overcame the difficulty of cargo transportation in limited space, efficiently completed the production of steel cages, gave full play to the advantages of small rotary drilling rig in the narrow space, completed the pile foundation construction with high quality, high efficiency and high safety, and it is highly recognized by customers.
Post time: Oct-16-2023